- Help Center
- Pool & Spa Liquid Chlorine/Acid Feeders
- Stenner Pump General Information
-
Certified Pool Operator Class (CPO)
-
Coronavirus (COVID-19)
-
Engineering Data/Calculators
-
Pool Operation 101
-
Pool & Spa Chemical Controllers
-
Pool & Spa Boilers
-
Pool & Spa Heaters and Heat Pumps
-
Pool & Spa Calcium Hypochlorite Feeders
-
Pool & Spa Liquid Chlorine/Acid Feeders
-
Pool & Spa Salt Systems/Chlorine Generators
- ChlorKing ChlorSM Series
- ChlorKing ChlorPDS Multi-Pool Controller
- ChlorKing ChlorVFS Multi-Pool Controller
- ChlorKing ChlorVFSD Multi-Pool Controller
- ChlorKing Nexgen 60 Month Maintenance Schedule (All Models)
- ChlorKing Nexgen How-To Videos (All Models)
- ChlorKing Nexgen pH 10/10R
- ChlorKing Nexgen pH 20/40/60/80
- ChlorKing Nexgen pH 50/100
-
Pool & Spa Filters
-
Pool & Spa Filtration/Feature Pumps
-
Pool & Spa Water Chillers
-
SDS Sheets
-
UV Systems
-
VivoPoint Tutorial
-
Water Safety Month
Maximizing the life of your Stenner tube
Here is a video and steps to maximize the life of your Stenner tube.
Stenner tubes need to be replaced on a regular basis, however it is important to maximize the life of your Stenner tube to last as long as possible.
Tips:
- Install stenner correctly
- Do not use thread seal tape
- Hold tube fitting to tighten the nut
- Position suction line and strainer 3” from tank bottom
- Allow slack in tube lines
- Clean all sediment from bottom of chemical tanks
- Install injector with the quill in the center of the water stream
- Store extra tubes in cool dry location
- Make sure he roller is not seized
- Clean roller assembly when you change tube
- Always center tube on roller
- Schedule Routine tube replacement and Maintenance