- Help Center
- Pool & Spa Liquid Chlorine/Acid Feeders
- Stenner Pump General Information
-
Certified Pool Operator Class (CPO)
-
Coronavirus (COVID-19)
-
Engineering Data/Calculators
-
Pool Operation 101
-
Pool & Spa Chemical Controllers
-
Pool & Spa Boilers
-
Pool & Spa Heaters and Heat Pumps
-
Pool & Spa Calcium Hypochlorite Feeders
-
Pool & Spa Liquid Chlorine/Acid Feeders
-
Pool & Spa Salt Systems/Chlorine Generators
- ChlorKing ChlorSM Series
- ChlorKing ChlorPDS Multi-Pool Controller
- ChlorKing ChlorVFS Multi-Pool Controller
- ChlorKing ChlorVFSD Multi-Pool Controller
- ChlorKing Nexgen 60 Month Maintenance Schedule (All Models)
- ChlorKing Nexgen How-To Videos (All Models)
- ChlorKing Nexgen pH 10/10R
- ChlorKing Nexgen pH 20/40/60/80
- ChlorKing Nexgen pH 50/100
-
Pool & Spa Filters
-
Pool & Spa Filtration/Feature Pumps
-
Pool & Spa Water Chillers
-
SDS Sheets
-
UV Systems
-
VivoPoint Tutorial
-
Water Safety Month
Stenner DuckBill Replacement
Here is a video on how to change out Stenner Duckbills
Duckbills are used with injectors to prevent backflow on systems. Not every body of water will need a duckbill. Duckbills should be changed every time you change your Stenner tube.
Steps:
- Turn off water flow
- Unscrew top fitting
- Remove duckbill from top fitting with needle nose pliers
- Insert screwdriver into injector left in pipe to clear any clogs
- Install new duckbill in top fitting
- Turn flow back on